Custom silicone development · RTV mold MOQ from 20 · DFM & prototype support

WhatsApp +86 135 3006 2969

RUUIPONRUUIPON

Quality Control for Custom RTV Silicone Molds

A quality page should show how we tell a CTQ from a cosmetic dimension. If you're buying a custom RTV mold, inspection is master-to-CAD, compound identity, Shore A when specified, cavity dimensions with a measurement condition, surface/tear checks, registration, a functional dump, and a golden-sample record for the reorder. "QC passed" with no CTQs and no method is a sticker, not a plan. Soft silicone changes shape under a caliper; a tolerance without relaxed / on a plate / in the jacket / loaded is incomplete.

Quality Control for Custom RTV Silicone Molds
RUUIPON production photo. Not a third-party marketplace image.

RUUIPON inspects RTV tools in Bao'an before pack. We do not inspect LSR cold-runner parts on this line. Food-contact is a compound document path: 21 CFR 177.2600 is extraction testing, not an FDA-approved factory stamp. See materials and compliance.

What we inspect (and what we sample)

CheckTypical whenNotes
Master / CAD revisionEvery new jobWrong revision is the most expensive miss
Compound / lot identityEvery lotMatch the quote; no silent substitute
Shore AWhen specifiedSkin vs jacket are different numbers
Critical cavity dims / volumeEvery mold or first-article plus sampleMethod named
Multi-cavity mapProduction traysDon't inspect cavity 1 and ship 48
Surface, bubbles, tears, logoEvery moldRaking light on the pocket
Keys / core / jacket assemblySplit and hollow toolsCannot assemble backwards
Functional dumpPrototype plus when CTQ is grams or peelReal material, not water only
PackEvery shipmentSee packaging and shipping
Golden sample / change controlAfter approvalReorder must cite it

Ask which of those are 100 percent and which are sampled. A production-critical depositor tray and a craft sculpture should not share the same sampling story.

Common mix-up: measuring soft rubber like a steel insert

Two inspectors can fail the same 10A tray because one squeezed the caliper. Write the condition: relaxed on a surface plate, seated in the mother mold, assembled on the master, or under a defined load. ISO 3302-1 M2 is a common default class on rubber drawings. It is a class, not a synonym for precision.

Measurement condition is part of the CTQ

Pick CTQs that actually reject product: cavity volume/grams, sealing diameter, wall, core location, tray flatness, registration, logo depth, the interface that mates a lid or a depositor nest. Don't put 40 dimensions on the report and miss the one that makes outer-row gummies heavy.

Typical shop values

ItemTypical shop value
Cavity Shore10A–20A platinum RTV (jacket behind loaded trays)
Platinum shrink~0.1–0.3% linear
Drawing class (if you need a rubber default)ISO 3302-1 M2 unless you name tighter and a method
Loaded-tray edge sag, unsupportedAbout 0.5–1.5 mm
Outer-row vs center on a sagging gummy trayOften 3–6% heavy
Prototype window / MOQ3–7 days after CAD lock; MOQ 20 after approval

Reference values only. Confirm material-specific limits against the supplier’s technical data and agree project acceptance criteria before production.

Failure: passed molds that don't dump on weight

Symptom: Incoming inspection green, production grams off; one cavity pretty, edge cavities fat; Shore about 20A by thumbnail; reorder feels different.

Confirm: Re-measure the same CTQs with the written method. Weigh a full dump map. Check lot vs the golden-sample compound. Check whether production omitted the jacket.

Fix: Quarantine the lot. Recast against the locked master if the skin is wrong; rebuild the jacket if the support is wrong. Don't add a visual inspector as the corrective action.

Worked example: 24-up chocolate bar, logo depth CTQ

A chocolatier named logo depth and bar weight as CTQs, measured with the tray seated in its jacket on a plate. We checked master depth before pour, Shore on the skin, then a cocoa-butter dump on cavities at center and both outer rows. Visual-only QC would have shipped a tray that looked sharp and dumped heavy at the edge. We would not have signed QC passed on cavity 1 alone.

What to ask when you're buying

  • Which dimensions are CTQ, and in what measurement condition?
  • What is 100% vs sampled on a 20-piece MOQ vs a 200-piece repeat?
  • Is a functional dump in the quote, and in which material?
  • How is Shore taken, and on the skin or the flange?
  • What document follows the compound lot, and what happens if the grade changes?

When this page is the wrong route

A one-off art mold with no dimensional CTQ still needs a visual and a peel check, not a 12-page FAI. If you need PPAP-style steel-tool reports for molded silicone parts, that's a finished parts program. Don't paste an LSR IQC form onto an RTV jacket. Geometry can override quantity: two molds of a medical-adjacent skin-contact tool may need more documentation than 50 craft trays.

Related: prototype validation, materials and compliance, factory audit, contact.

RFQ: QC plan the inspector can run

Copy this.

  • CAD/master revision to inspect against
  • CTQ list + tolerance + measurement condition
  • Shore A if controlled, and where on the mold
  • Functional test: weight, fit, flatness, registration, demold
  • Visual limits: flash, bubbles, tears, logo fill
  • Sampling: every mold vs first-article + n per lot
  • Golden sample ID for reorders
  • Food-contact docs if required (compound-matched)

Send the CTQ list and how you will measure a soft mold on your incoming bench. We will mirror that method in Bao'an so the two reports can be compared. [email protected] · +86 135 3006 2969.

We would not recommend calling a mold QC passed with no CTQs

We would not recommend inspecting one cavity of a 48-up and shipping the rest. We would not recommend thumbnail Shore as the hardness record. We would not substitute compound on a reorder without a written change.

RUUIPON Mold Structure Decision:

  1. CTQs and measurement condition named? - yes -> Flat back?
  2. Flat back? - yes -> Open-back RTV + tray flatness if loaded
  3. Flat back? - no -> Deep undercuts?
  4. Deep undercuts? - cannot peel -> Inspect keys, plugs, cores as CTQs

FAQ

What's the difference between prototype sign-off and production QC? Prototype proves the design. Production QC proves each mold (or a sample of the lot) still matches that design. Don't skip either and call the other the inspection.

Can you inspect Shore A on every mold? Yes if you name it as a CTQ. On a 10A-20A skin, take it on a thick enough pad, not on a knife-edge flange, and write the method.

Do you issue an FDA certificate with QC? No factory stamp. Food jobs get the compound/lot pack you named: 21 CFR 177.2600 extraction and/or LFGB on the grade used. QC photos are not that pack.

How do you handle multi-cavity variation? Map, don't spot-check the prettiest pocket. Outer rows are where sag shows up.

What should be measured on a reorder? The same CTQs, same method, same golden sample. If master, Shore, or structure changed, it's not a reorder. It's a new first article.