Multi-Cavity Production Trays: Spacing, Yield, and Restock Labor
A one-cavity sample hides cavity 11. Ads scale, you cut 12, grams drift, FBA pack math breaks. This service is the production sheet: spacing, webs, and yield against your pack count.
2018
Shenzhen shop
MOQ 20
Per design
3-7 days
After CAD lock
~24h
Complete RFQ
Yield is a tray spec, not a warehouse afterthought

If the listing claims 12 and the tray is 8, leftover mix ages in a tub. If the tray is 12 and cavity 11 is 0.6 g heavy, the label is a ticket. We ask pack count and gram target before we cut a production sheet.
Layout spacing already has a blog. This URL is the production service: you are buying trays, not an article.
A 24-up is not free if you demold by hand
We can cut more cavities. You still peel them. Thin webs on a heavy chocolate fill tear in your kitchen, not in our quote PDF. If weekly pieces are 200 and you have one person, a 12-up with honest webs is often the adult sheet. A 24-up that rips is a listing outage.
Approve production yield on a production-count sample, not on a one-cavity hero. Cavity 11 vs cavity 1 is a gram conversation if a label exists.
Spacing and webs we push back on
Labor on demold is your shop. We will not pretend a 24-cavity sheet is free if the webs tear.
| Input | What we do |
|---|---|
| Webs under 4 mm on a heavy fill | Push back |
| 12 cavities, no gram target | Wait |
| One-cavity approval then 12-up | Risk note |
| MOQ 20 | Trays per design |
Not a clone of the layout blog
The blog is how to think about spacing. This page is the commercial path to order the sheet. Different H2 stack, different CTA job.
RFQ
Pack count, weekly pieces, pour, gram band if the label needs it, whether variety SKUs share a cavity. If ads are already live, say so. Spare math changes.
FAQ
Should first SKU be 1 cavity?
A 1-cavity sample is a sample. Production yield is a different tool. See also first-SKU cavity count on the blog.
Steel nest instead?
Wrong lane for this URL. We quote soft trays.
MOQ?
20 trays per design.
Can three flavors share one 12-up?
Same cavity, three fills, three densities. We still need all three named. Grams will not match by magic.
Related process pages
- ServiceDFM reviewRUUIPON DFM review for custom silicone molds: draft 1-3 deg, island meat, undercut budget, Shore after chemistry. MOQ 20. Not a WYD plant depositor brief.
- ServiceVacuum platinum traysPlatinum-cure production sheets with vacuum degassing for brand restock. MOQ 20, Shenzhen since 2018. Not a tin kit and not a plant mogul tool.
- ServiceFood-contact quotingQuote food-contact silicone molds with FDA 21 CFR 177.2600 and LFGB sections 30/31 on request. No FDA-approved factory language. MOQ 20. Brand lane, not plant mogul.
- ServiceCAD from sampleRUUIPON models cavities from a master you own: calipers, depth, islands. Drawing deposit about $50. MOQ 20. Not a clone of a purchased tray.
Send the files for this process
Send your design, target material, and quantity. We confirm silicone grade, hardness, and certification needs - usually within 24 hours.
