Custom silicone development · RTV mold MOQ from 20 · DFM & prototype support

WhatsApp +86 135 3006 2969

RUUIPONRUUIPON

Low-Risk Custom Mold Launch

Low MOQ Custom Silicone Molds — 20 Per Approved Design

Order custom RTV silicone molds from 20 per approved design. See what the MOQ covers, what it excludes, and what to send for a mold RFQ. Shenzhen factory.

For applicable custom RTV silicone mold projects, RUUIPON's production minimum is 20 molds per approved design, after prototype and design sign-off. That is a tooling policy, not a discount: it reflects the setup cost of pouring and finishing a mold, not the price of a finished silicone part. If you are validating a new shape, logo, cavity weight or production workflow, this is the route that lets you commit without a large first order.

What the 20-mold minimum actually covers

One approved design means one locked cavity geometry: the master, the parting strategy, the draft, the cavity count and the surface finish are fixed at sign-off. The 20 molds are produced from that single approved geometry.

This is deliberately narrow. A low minimum is useful when the risk is design risk — you need to see how a logo reads in chocolate, whether a gummy releases cleanly from a deep cavity, or how a candle holds a fine texture. It is not a way to make 20 different variants cheaply. If you need three cavity counts or two logo depths, those are separate designs and separate approvals.

What we lock before production: master custody, pull direction, no-split faces, undercut strategy, jacket requirement, target dump material, texture, and the measurement method for the critical dimension. Changing any of these after approval means a new design review, not a recast. If the structure is still open, check wall thickness before the master is cut and decide whether a jacket is needed first.

To see where the prototype ends and the run begins, compare a prototype against a production run before you fix the quantity.

When the 20-mold MOQ does not apply

Your requestCorrect route
Finished silicone parts (HCR/HTV compression, LSR injection)Quote finished silicone parts separately — priced by process, tooling and volume
A single paid test cavity before committingPrototype line, not a production MOQ
A catalog mold that already matches your shapeStock/catalog order; no custom tooling needed
High-volume LSR cold-runner toolingDedicated LSR tool RFQ, quoted separately
Two split sculpture molds with keys and registrationStill tooling, but geometry — not quantity — sets the price

A common mix-up: an "MOQ 1" claim next to photos of an eight-cavity steel tool describes a different business. Read the process before you compare minimums. The 20-mold policy applies to custom RTV silicone molds we pour in-house, not to every silicone program we quote.

What we need to quote your mold

Send the following and our engineering team can review the geometry before any commitment:

  • A STEP or STL file, a dimensioned drawing, or clear photos plus a physical sample;
  • Target piece weight or cavity volume, and the material you will pour (chocolate, gummy, wax, soap, resin, plaster);
  • Cavity count and the equipment used to fill it (hand pour, depositor, flood-and-scrape);
  • Pull direction, any faces that must stay un-split, and where a parting line is acceptable;
  • Any food-contact or other compliance requirements — state food-contact requirements at RFQ, not after tooling;
  • Expected monthly output and whether recasts will be needed;
  • Who keeps the master after the run.

CAD work for custom molds starts from USD 50 and is scoped after we see the geometry. The schedule is confirmed after design review, because master complexity and the number of trial pours drive it more than order size does. If schedule is the deciding factor, read what controls mold lead time.

From approved prototype to production

  1. Geometry review — we check draft, undercuts and wall thickness before a master is cut.
  2. Prototype / first article — one paid test cavity, measured against the critical dimension you named.
  3. Design sign-off — the cavity geometry is locked and recorded as the approved design.
  4. Production pour — 20 molds minimum per approved design, with the agreed finish and jacket.
  5. Repeat ordering — recasts reference the archived master and the locked geometry, so a reorder does not restart the design review.

If you are comparing quotes, ask each shop the same four questions: what is excluded from the MOQ, who owns the master, what a recast costs, and whether the shop actually pours the mold in-house. The answers separate a tooling policy from a marketing number.

Frequently asked questions

What does "20 molds per approved design" mean?

It means 20 production silicone molds made from one cavity geometry that you have signed off after prototype review. A different cavity count, logo depth or parting strategy is a different design with its own minimum.

Can I order fewer than 20 for a first test?

A single paid prototype or first-article cavity is a separate prototype line. The 20-mold minimum applies to the production run that follows design approval.

Does the MOQ apply to finished silicone products?

No. Finished HCR/HTV parts, LSR components and metal-tool programs are quoted by process, tooling and volume. Send those as a separate finished-parts RFQ.

Do you provide food-contact documentation for food-grade molds?

Food-contact requirements must be stated before tooling. We select the compound and supply the applicable documentation for the order; we do not describe a material as "FDA approved". Tell us the market and the intended contact use at RFQ stage so the right paperwork is scoped.

Who owns the mold and the master?

Ownership and archive terms are agreed at sign-off, before the production pour. Ask for this in writing — it determines what a repeat order costs a year later.

Next step

Send your STEP/STL, a dimensioned drawing, or photos plus a physical sample, together with the pour material, cavity count and monthly volume. We will confirm whether your project fits the low-MOQ RTV route, scope the CAD work, and return a mold RFQ with the design-review schedule. Send a mold RFQ.

Send your geometry for a low-MOQ mold RFQ

Include STEP/STL or a dimensioned drawing, the pour material, cavity count and monthly volume. We confirm whether the project fits the 20-per-approved-design route before quoting.